Design of bridges and enginneering structures

iso 9001

iso 14001

Minősített NATO

MOTORWAY - BRIDGE OVER THE EASTERN MAIN CHANNEL

Back

Location:

Principal:Nemzeti Autópálya Rt. (National Motorways Ltd)

Year:2006

Revenue:

Download:MOTORWAY - BRIDGE OVER THE EASTERN MAIN CHANNEL

Technical data:

Total length of the bridge: 150 m
Spans: 44,0 m + 60,0 m + 44,0 m
Width of the bridge: 1,53 + 12,13 + 0,53 + 0,40 m gap + 0,54 + 12,13 + 1,53 = 29,20 m
Intersection angle: (between the bridge axis and the Keleti Főcsatorna - Eastern Main Channel) 70 °

Services:

Design for Approval
Tender design
Execution designs
Technical supervision
As-built designs, Instructions for the Operator

MOTORWAY - BRIDGE OVER THE EASTERN MAIN CHANNEL

Bridge structure:
Two parallel girder bridges with wedged steel supports acting with the rc plate.
Innovative characteristics of the bridge:
− The innovative structure of the rc deck slab and the method of its dimensioning allowed to omit completely the relocation/moving of the supports, time- and work consuming activities.
− For the in-site assembling procedure of the steel structure temporary supports were used, replaceable by crane in 1 piece and not needing separate foundation work (REM 500 type temporary supports produced in GDR)
These yokes type were used also at the construction of other bridges.
− The steel pipe yokes used also for the concreting of the deck slab were constructed on the temporary backfills along the two riversides.

News

Projects

Electrification of Budapest – Esztergom Railway line

The construction of Esztergom railway line began in the 19th century, originally the track has meant to be a commuter (local) line. The primary goal of the railway track was to secure the supplement of coal for Budapest’s factories and population. In the 20th century the coal mining dropped back and the surrounding settlements rapidly increased. The role of freight traffic was taken over by the suburban passenger traffic.