Airport design
Location:Budapest
Principal:BUDAPEST AIRPORT
Year:2016.
Revenue:
Features:
Total paved surface:
1 900 m2 asphalt pavement
900 m2 sidewalk with concrete pavers
12 800 m2 gravel area
900 m of new fence
50 parking spaces
6 bus parking spaces
500 m new sidewalk
1 new public bus stop
Water supply, Floodlighting, Power supply with new transformer station.
Visitor center with ticket office, gift shop, office, simulator, toilet facilities, luggage storage.
Preparation of design for approval and construction design
Due to the extension of the Holiday car park at Budapest Liszt Ferenc International Airport, it was necessary to move the outdoor aviation museum to a new location.
The necessary infrastructure was complex, in addition to the construction of a road and sidewalk providing access to the new and larger exhibition area, as well as bus stops, a fence, a visitor center and public utilities had to be provided for the future Aeropark.
The most special part of the work was the rollover of old (unused for decades - eg Tu-154, IL-18) aircrafts in an undamaged condition. This task was completed with the aid of a new temporary road with adequate fall to withstand the load of the aircraft.
During the project the following sectoral design works were completed:
- geodesy, geotechnical engineering
- airport design, road design (pavements)
- hydraulic engineering (pavement structure, dewatering, water supply)
- high voltage power supply (power supply, transformer, outdoor lighting)
- organization (schedule, temporary traffic regulation)
- architecture
- structural engineering