Design of bridges and enginneering structures
Location:
Principal:North-Est Hungary Motorway Investment and Operating Ltd, Hungarian Bridge Construction Consortium, M3 Motorway Project Bureau
Year:2002
Revenue:
Total length of the bridge: 405 m (together with the floodplain, bridges)
River bridge spans: 72 m + 112 m + 72 m
Width of the bridge: 1,285 + 10,5 m + 0,565 +0,87+0,565 + 10,5 m + 1,285 = 25,57 m.
Design for Approval
Tender design
Execution designs
Technical supervision
As-built designs, Instructions for the operator
Bridge structure: two parallel girder bridges with wedged steel supports acting with the rc plate. Innovative characteristics of the bridge:
− The innovative structure of the rc deck slab and the method of its dimensioning allowed to omit completely the interim temporary supports and to minimize the relocation/moving of the supports, timeand work consuming activities.
− The construction of the deck slab started with the concreting of the sections above the piers.
− Almost all connections are welded − First application of large thickness (vmax=100 mm) boom plates
− The steel structures of the bridges (2x1050t) were mounted on the riverside and floated as 1 completed piece to their place
in longitudinal and transversal direction, by means of floating and lifting engines.