Design of bridges and enginneering structures

iso 9001

iso 14001

Minősített NATO

Project nameLocationPrincipalYearRevenueDocument
EXTENDING AIRPORT CONTROL TOWER BUDAPEST FERIHEGY KV Közkereseti Társaság (Unlimited Partnership) 1998 EXTENDING AIRPORT CONTROL TOWER BUDAPEST FERIHEGY
MOTORWAY – BRIDGE OVER THE TISZA RIVER North-Est Hungary Motorway Investment and Operating Ltd, Hungarian Bridge Construction Consortium, M3 Motorway Project Bureau 2002 MOTORWAY – BRIDGE OVER THE TISZA RIVER
„SZT. LÁSZLÓ” MOTORWAY - BRIDGE OVER THE DANUBE National Motorways Ltd, Hungarian Bridge Construction Consortium 2002 „SZT. LÁSZLÓ” MOTORWAY - BRIDGE OVER THE DANUBE
MOTORWAY - BRIDGE OVER THE EASTERN MAIN CHANNEL Nemzeti Autópálya Rt. (National Motorways Ltd) 2006 MOTORWAY - BRIDGE OVER THE EASTERN MAIN CHANNEL
MOTORWAY - BRIDGE OVER THE MURA RIVER Nemzeti Autópálya Rt., NIF Zrt. 2009 MOTORWAY - BRIDGE OVER THE MURA RIVER
Szombathely-Szentgotthárd Railway line Railway bridge GYSEV C. C. LTD. 2010 Szombathely-Szentgotthárd Railway line Railway bridge

Reference search

Keyword:

Branch:

News

Projects

Electrification of Budapest – Esztergom Railway line

The construction of Esztergom railway line began in the 19th century, originally the track has meant to be a commuter (local) line. The primary goal of the railway track was to secure the supplement of coal for Budapest’s factories and population. In the 20th century the coal mining dropped back and the surrounding settlements rapidly increased. The role of freight traffic was taken over by the suburban passenger traffic.

More

Print