Nemzeti Autópálya Zrt. M44 autópálya KŐRÖS-HÍD
SON-AIR Szolgáltató és Tanácsadó Bt. TASZÁR REPÜLŐTÉR POLGÁRI SZEKTOR
Civil-Plan Kft. BÉCSI DOMBI ALAGÚT
 

Newsletter

Demszky and Csillag have taken a bus – the Metro project will be launched at
[ 2003.06.24. 15:51]
István Csillag and Gábor Demszky have taken a bus to appraise how long will it take to get from the railway terminal at Kelenföld to the Eastern Terminal (Keleti Pályaudvar)
Details»

» Articles Archives

Client:
MÁV Szombathely Directorate via MÁVTI

BALLA HILL TUNNEL OF THE HUNGARIAN - SLOVENIAN RAILWAY LINE NAGYRÁKOS

Year of planning:
1997

Technical data:
Total length of tunnel: 375 m
Length of construction, cut-and-cover: 45+39 m
Length of construction, mining method: 291 m
Section of tunnel:
single track railway tunnel sectionDesign speed: 160 km/h
Maximum rock cover: 12 m
Area of rock section: 74 m2
Area of clear tunnel section:
45 m2
Alignment of tunnel:
horizontal: curve of R = 2.300 m vertical: 12 %o

Services:
-Preliminary design
-Design for approval
-Tender document

» See references

 
 
  Top of Page Homepage Contact Sitemap